投標書模板範文其實有很多的,那麼標書製作,需要按照招標文件的每一步格式去編寫。
項目投標書是每一位投標人都需要製作的文件,只有將項目投標書編制完好了才能順利開展接下來的投標、評標、開標、中標等重要環節,也才有希望成為中標人。那麼,編制項目投標書的基礎是什麼呢?就是基於國家規定和招標人要求的投標書範本。如下給大家分享項目投標書範本!
項目投標書(範本)
標 書 總 目 錄
第一部分:投標書
一、投標書…………………………………………
二、投標申請單位概況……………………………
三、授權書…………………………………………
四、投標報價………………………………………
五、報價說明與建議………………………………
六、優惠條件………………………………………
第二部分:綜合說明
一、承建該工程的指導思想及目標………………
二、承建該工程的有利條件及優勢………………
三、工程工期目標及保證措施……………………
四、工程質量目標及保證措施……………………
第三部分:施工組織設計
一、工程概況………………………………………
二、施工方案概述…………………………………
三、編制施工進度和勞力計劃……………………
四、保證工程工期的具體措施……………………
五、施工程序與質量控制要點……………………
六、保證工程質量的具體措施…………………
七、安全文明施工的規定和措施………………
八、附圖附表………………………………………
第四部分:標書附件
一、資質證明………………………………………
二、企業相關制度…………………………………
三、證書及工程圖片………………………………
第一部分:投標書
一、投標書(招標人名稱):各位領導、各位專家、各位評委:首先,感謝貴單位對我公司的信任,使我公司有機會參與貴單位的投標,我們深感榮幸並表示真誠的謝意。我公司仔細研究了貴單位工程的招標文件及有關資料,同時對施工現場及周圍環境進行了調查了解,經過反復論證、認真分析,願意承擔貴單位所發文件中的各項條款,同時做出了符合該工程工期、質量等各方面的施工安排,組織技術熟練、質量過硬、善打硬仗的施工隊伍負責該工程的施工。如蒙信任,由我公司中標承擔該工程的施工,我們兌現標書中的所有承諾,為貴單位做出我們應有的貢獻。投標單位:法定代表人:
單位地址:
郵政編碼:
聯系電話:
傳 真:
三、授權書
本授權書宣告:在下面簽字的 同志為我公司的名義合法代理人,就 工程以我公司的名義簽署投標書,進行投標、談判、簽署合同和處理與此有關的一切事務。
授權人:
被授權人:
投標單位:
投標日期:
四、投標報價(略)
五、報價說明與建議
1、我公司首先考慮用戶的不同需求,確定為三種配置價格供用戶自由選擇。
2、改變同類企業從五金配置上做文章的做法,公開透明買賣公道,以保護用戶的切身利益。
3、針對該工程的建築規模、建築標准、建築風格、地理環境、使用功能及消費群體。我們建議您:「什麼地方可設計什麼樣的門窗」、「什麼地方可使用什麼配置的五金件」,我們力求使用戶在門窗上達到最佳設計和最佳配置。
六、我公司承建該工程的優惠條件(略)
第二部分:綜合說明
(招標人名稱):
各位領導、各位專家、各位評委:我公司如若中標,我們將以良好的社會信譽、雄厚的技術實力、優質、熱情的服務,感謝貴單位對我公司的信任。我們將把該工程列為公司重點工程,從各個方面做好充分准備,及時組織產品生產、及時組織安裝人員進場,按期開工,優質高效地完成施工任務,兌現我們的所有承諾。現將標書重點內容綜述如下:
一、我公司承建該工程的指導思想及目標
1、指導思想:
我公司秉承集團「以質量求規模、以規模求效益」、「讓利不讓市場」的經營方針,為最大限度地發揮我公司設備先進技術力量雄厚、管理手段現代化的優勢,在獲取經濟效益的同時,力求獲取更大程度上的社會效益。我公司承建該工程決心是堅決的,我們的態度是:以積極誠實的態度、優質的服務,為業主建成一個高速、優質的工程項目。
2、工程目標:
(1)工程質量:合格率100%,定項優良率100%。
(2)工程進度:確保門窗分項,積極配合和促進總項計劃的實現。
二、我公司承建該工程的有利條件和優勢
1、具有承接該工程的綜合實力
具體詳情(略)。
2、具有先進的管理手段和管理班子
具體詳情(略)。
3、具有配套專業隊伍和成熟施工經驗
具體詳情(略)。
三、工程工期目標及保證措施
根據招標單位要求及工程實際情況,我們本著為業主服務,盡最大努力滿足業主要求的態度,參照國家定額工期,結合我公司的實際施工能力,確定該工程的施工總工期為____天,即從年月日開工,年月日竣工。為確保總工期的實現,我們擬採取以下保證措施:
1、組織措施
(1)該工程由我公司承建後,將列為我公司重點工程管理項目推行項目法施工,並充分發揮我公司技術力量強、資金雄厚、管理水平高的優勢,全力以赴協調解決施工力量和機具設備。
(2)實行公司重點項目指揮部領導下的項目經理負責制。由項目經理簽訂責任狀,對項目按工期進行監督、檢查,並與施工人員簽訂單位工程施工合同,及時兌現獎罰,實行單位工程包干施工,保證在控制點的時間內完成。
2、管理措施
(1)加快施工准備。我公司已經做好了承建該工程的各項准備工作,並按工程的需要保證在貴方要求的時間內,主要管理人員及時到位,同時編制切實可行的工程總進度網路計劃,並做好相應的日、旬、月計劃,堅持日平衡、旬調度,狠抓工程進度,保證計劃實施。
(2)根據確定的工期目標,編制切實可行的日、周、月、季、年計劃,運用網路技術、分段流水作業等動態管理和微機優選技術,充分利用作業面,切實做好工序之間的穿插施工,做到工期進度控制點保證總工期。
(3)充分協調好關系層與勞務層之間的關系,制定嚴密的獎罰措施,充分調動各方面的積極性,最大限度地提高勞動生產率。
(4)合理安排農忙季節和季節性施工。採取必要的措施,保證工程連續施工。加強與氣象部門的聯系,根據氣候情況,編制切實可行的季節性施工措施,最大限度地減少因氣候因素造成的停工。農忙季節決不放假,同時實行優惠的勞務經濟政策,調劑穩定勞動力,保證按工程進度計劃完成。
(5)運用新工藝、新技術、新材料、提高工程質量,加快施工進度,同時加強施工機具的管理,保證機具運轉良好,充分發揮其效能,確保施工正常進行。
(6)充分協調好外部關系,特別是搞好同建設單位、監理單位的關系,在工作中共同協作,互相支持。
四、工程質量目標及保證措施(略)
五、我公司產品和安裝質量執行的國家標准(略)六、服務回訪與公司保修政策(略)七、駐工地代表及主要負責人簡介八、部分優良工程及在建工程情況一覽表
第三部分:施工組織設計一、工程概況1、工程名稱:
2、施工地點:
3、建築面積:
4、塑鋼面積:
5、牆體結構:
6、類型:
7、高度:
8、層數:
二、施工方案概述工程質量為:保證優良、爭創「十佳」。工程工期:開工時間
年 月 日,竣工時間 年 月 日,總日歷天數
天。我公司將把該工程列為重點工程,公司將選派精乾的管理班子,成立該工程項目部。選派素質好、創優能力強的施工人員,裝備優良施工機具,以確保該工程質量和工期。
三、編制施工進度和勞力計劃
1、施工進度計劃編制依據:
(1)開工日期、完工日期、總工期天數。
(2)單窗、陽台窗、異型窗、門連窗、推拉門數。
(3)土建主體驗收時間、框安裝至完工時間、內外粉飾時間、扇安裝至完工時間。
2、勞力計劃編制依據:
(1)根據計劃工程量(m2)和計劃工期(天)要求,計算該工程總體需要多少個工人,才能按量按期完成。
(2)框安裝至完工,計劃需多少勞力、扇安裝至完工,包括細部處理打膠等,計劃需多少勞力。
四、保證工程工期的具體措施(略)
五、施工程序與質量控制要點(略)
六、保證工程質量的具體措施(略)
七、安全文明施工的規定和措施(略)
八、附圖附表
1、工程管理組織系統圖(略)。
2、施工進度計劃網路圖(略)。
3、工程質量管理體系圖(略)。
4、施工程序與質量控制要點一覽表(略)。
5、安全文明施工體系圖(略)。
第四部分:標書附件
一、資質證明
1、營業執照(副本)注冊號:××××××××××
2、稅務登記證:××××××××××
3、全國工業產品生產許可證:××××××××××
4、產品准用證:編號02340
5、×××市建設工程材料准用證××××××××××
6、質量體系認證證書:注冊號××××××
7、×××省名牌證書
8、檢驗報告:檢(建機)字(99)第C021
二、企業相關制度
1、公司質量手冊(略)。
2、公司保修服務承諾制度(略)。
三、證書及工程圖片(略)
以上就是項目投標書範本。一份完整的項目投標書通常包括投標書、綜合說明、施工組織設計、標書附件這四大部分,投標書中的內容是最重要的,也是我們最應該嚴格編制檢查的內容,這代表了我們作為投標單位承接項目的能力及誠意。
如果幫助到您,歡迎點贊鼓勵!
B. 網路安全 畢業設計
沒有10頁紙,是寫不下這個規劃書的。
C. 標書製作範本
標書製作,需要按照招標文件的每一步格式去編寫。
項目投標書是每一位投標人都需要製作的文件,只有將項目投標書編制完好了才能順利開展接下來的投標、評標、開標、中標等重要環節,也才有希望成為中標人。那麼,編制項目投標書的基礎是什麼呢?就是基於國家規定和招標人要求的投標書範本。如下給大家分享項目投標書範本!
項目投標書(範本)
標 書 總 目 錄
第一部分:投標書
一、投標書…………………………………………
二、投標申請單位概況……………………………
三、授權書…………………………………………
四、投標報價………………………………………
五、報價說明與建議………………………………
六、優惠條件………………………………………
第二部分:綜合說明
一、承建該工程的指導思想及目標………………
二、承建該工程的有利條件及優勢………………
三、工程工期目標及保證措施……………………
四、工程質量目標及保證措施……………………
第三部分:施工組織設計
一、工程概況………………………………………
二、施工方案概述…………………………………
三、編制施工進度和勞力計劃……………………
四、保證工程工期的具體措施……………………
五、施工程序與質量控制要點……………………
六、保證工程質量的具體措施…………………
七、安全文明施工的規定和措施………………
八、附圖附表………………………………………
第四部分:標書附件
一、資質證明………………………………………
二、企業相關制度…………………………………
三、證書及工程圖片………………………………
第一部分:投標書
一、投標書(招標人名稱):各位領導、各位專家、各位評委:首先,感謝貴單位對我公司的信任,使我公司有機會參與貴單位的投標,我們深感榮幸並表示真誠的謝意。我公司仔細研究了貴單位工程的招標文件及有關資料,同時對施工現場及周圍環境進行了調查了解,經過反復論證、認真分析,願意承擔貴單位所發文件中的各項條款,同時做出了符合該工程工期、質量等各方面的施工安排,組織技術熟練、質量過硬、善打硬仗的施工隊伍負責該工程的施工。如蒙信任,由我公司中標承擔該工程的施工,我們兌現標書中的所有承諾,為貴單位做出我們應有的貢獻。投標單位:法定代表人:
單位地址:
郵政編碼:
聯系電話:
傳 真:
三、授權書
本授權書宣告:在下面簽字的 同志為我公司的名義合法代理人,就 工程以我公司的名義簽署投標書,進行投標、談判、簽署合同和處理與此有關的一切事務。
授權人:
被授權人:
投標單位:
投標日期:
四、投標報價(略)
五、報價說明與建議
1、我公司首先考慮用戶的不同需求,確定為三種配置價格供用戶自由選擇。
2、改變同類企業從五金配置上做文章的做法,公開透明買賣公道,以保護用戶的切身利益。
3、針對該工程的建築規模、建築標准、建築風格、地理環境、使用功能及消費群體。我們建議您:「什麼地方可設計什麼樣的門窗」、「什麼地方可使用什麼配置的五金件」,我們力求使用戶在門窗上達到最佳設計和最佳配置。
六、我公司承建該工程的優惠條件(略)
第二部分:綜合說明
(招標人名稱):
各位領導、各位專家、各位評委:我公司如若中標,我們將以良好的社會信譽、雄厚的技術實力、優質、熱情的服務,感謝貴單位對我公司的信任。我們將把該工程列為公司重點工程,從各個方面做好充分准備,及時組織產品生產、及時組織安裝人員進場,按期開工,優質高效地完成施工任務,兌現我們的所有承諾。現將標書重點內容綜述如下:
一、我公司承建該工程的指導思想及目標
1、指導思想:
我公司秉承集團「以質量求規模、以規模求效益」、「讓利不讓市場」的經營方針,為最大限度地發揮我公司設備先進技術力量雄厚、管理手段現代化的優勢,在獲取經濟效益的同時,力求獲取更大程度上的社會效益。我公司承建該工程決心是堅決的,我們的態度是:以積極誠實的態度、優質的服務,為業主建成一個高速、優質的工程項目。
2、工程目標:
(1)工程質量:合格率100%,定項優良率100%。
(2)工程進度:確保門窗分項,積極配合和促進總項計劃的實現。
二、我公司承建該工程的有利條件和優勢
1、具有承接該工程的綜合實力
具體詳情(略)。
2、具有先進的管理手段和管理班子
具體詳情(略)。
3、具有配套專業隊伍和成熟施工經驗
具體詳情(略)。
三、工程工期目標及保證措施
根據招標單位要求及工程實際情況,我們本著為業主服務,盡最大努力滿足業主要求的態度,參照國家定額工期,結合我公司的實際施工能力,確定該工程的施工總工期為____天,即從年月日開工,年月日竣工。為確保總工期的實現,我們擬採取以下保證措施:
1、組織措施
(1)該工程由我公司承建後,將列為我公司重點工程管理項目推行項目法施工,並充分發揮我公司技術力量強、資金雄厚、管理水平高的優勢,全力以赴協調解決施工力量和機具設備。
(2)實行公司重點項目指揮部領導下的項目經理負責制。由項目經理簽訂責任狀,對項目按工期進行監督、檢查,並與施工人員簽訂單位工程施工合同,及時兌現獎罰,實行單位工程包干施工,保證在控制點的時間內完成。
2、管理措施
(1)加快施工准備。我公司已經做好了承建該工程的各項准備工作,並按工程的需要保證在貴方要求的時間內,主要管理人員及時到位,同時編制切實可行的工程總進度網路計劃,並做好相應的日、旬、月計劃,堅持日平衡、旬調度,狠抓工程進度,保證計劃實施。
(2)根據確定的工期目標,編制切實可行的日、周、月、季、年計劃,運用網路技術、分段流水作業等動態管理和微機優選技術,充分利用作業面,切實做好工序之間的穿插施工,做到工期進度控制點保證總工期。
(3)充分協調好關系層與勞務層之間的關系,制定嚴密的獎罰措施,充分調動各方面的積極性,最大限度地提高勞動生產率。
(4)合理安排農忙季節和季節性施工。採取必要的措施,保證工程連續施工。加強與氣象部門的聯系,根據氣候情況,編制切實可行的季節性施工措施,最大限度地減少因氣候因素造成的停工。農忙季節決不放假,同時實行優惠的勞務經濟政策,調劑穩定勞動力,保證按工程進度計劃完成。
(5)運用新工藝、新技術、新材料、提高工程質量,加快施工進度,同時加強施工機具的管理,保證機具運轉良好,充分發揮其效能,確保施工正常進行。
(6)充分協調好外部關系,特別是搞好同建設單位、監理單位的關系,在工作中共同協作,互相支持。
四、工程質量目標及保證措施(略)
五、我公司產品和安裝質量執行的國家標准(略)六、服務回訪與公司保修政策(略)七、駐工地代表及主要負責人簡介八、部分優良工程及在建工程情況一覽表
第三部分:施工組織設計一、工程概況1、工程名稱:
2、施工地點:
3、建築面積:
4、塑鋼面積:
5、牆體結構:
6、類型:
7、高度:
8、層數:
二、施工方案概述工程質量為:保證優良、爭創「十佳」。工程工期:開工時間
年 月 日,竣工時間 年 月 日,總日歷天數
天。我公司將把該工程列為重點工程,公司將選派精乾的管理班子,成立該工程項目部。選派素質好、創優能力強的施工人員,裝備優良施工機具,以確保該工程質量和工期。
三、編制施工進度和勞力計劃
1、施工進度計劃編制依據:
(1)開工日期、完工日期、總工期天數。
(2)單窗、陽台窗、異型窗、門連窗、推拉門數。
(3)土建主體驗收時間、框安裝至完工時間、內外粉飾時間、扇安裝至完工時間。
2、勞力計劃編制依據:
(1)根據計劃工程量(m2)和計劃工期(天)要求,計算該工程總體需要多少個工人,才能按量按期完成。
(2)框安裝至完工,計劃需多少勞力、扇安裝至完工,包括細部處理打膠等,計劃需多少勞力。
四、保證工程工期的具體措施(略)
五、施工程序與質量控制要點(略)
六、保證工程質量的具體措施(略)
七、安全文明施工的規定和措施(略)
八、附圖附表
1、工程管理組織系統圖(略)。
2、施工進度計劃網路圖(略)。
3、工程質量管理體系圖(略)。
4、施工程序與質量控制要點一覽表(略)。
5、安全文明施工體系圖(略)。
第四部分:標書附件
一、資質證明
1、營業執照(副本)注冊號:××××××××××
2、稅務登記證:××××××××××
3、全國工業產品生產許可證:××××××××××
4、產品准用證:編號02340
5、×××市建設工程材料准用證××××××××××
6、質量體系認證證書:注冊號××××××
7、×××省名牌證書
8、檢驗報告:檢(建機)字(99)第C021
二、企業相關制度
1、公司質量手冊(略)。
2、公司保修服務承諾制度(略)。
三、證書及工程圖片(略)
以上就是項目投標書範本。一份完整的項目投標書通常包括投標書、綜合說明、施工組織設計、標書附件這四大部分,投標書中的內容是最重要的,也是我們最應該嚴格編制檢查的內容,這代表了我們作為投標單位承接項目的能力及誠意。
如果幫助到您,歡迎點贊鼓勵!
D. 請問標書的格式、字體、行間距有什麼要求
關於標書的格式、字體、行間距的要求:
1、紙張要求
封底、封面、正文採用A4紙、白色,裝訂後的尺寸為210*297mm(標准A4尺寸),施工平面圖及進度計劃表採用A3或A4白紙。
2、列印樣式
為單面或者雙面列印,不應出現正反及上下倒裝頁。封面、封底處不應露明裝訂針和線。所有投標書均不得採用活頁(穿孔式、文件夾式等)方式裝訂。
3、版面規格
版面設置:上邊距為26mm,下邊距為22mm,左邊距為25mm,右邊距為25mm,裝訂線位於紙張左側3mm(可根據頁數多少適當調整)。
4、字體規格
文章標題為三號黑體(可加粗),節標題為小三號黑體(可加粗),正文字體為小四號宋體(不加粗),所有字體顏色均為黑色。
(4)網路安全標書範本擴展閱讀
標書編制要注意的幾個原則:
1、全面反映使用單位的需求的原則
招標將面對的使用單位對自己的工程、項目、貨物了解程度的差異非常大。再加上項目的復雜程度大,招標機構就要針對使用單位狀況、項目復雜情況,組織好使用單位進行設計,並由專家編制好標書,做到全面反映使用單位需求。
2、科學合理的原則
技術要求商務條件必須依據充分並切合實際;技術要求根據項目現場實際情況、可行性報告、技術經濟分析確立,不能盲目提高標准、提高設備精度、房屋裝修標准等等,否則會帶來功能浪費,多花不必要的錢。
3、公平競爭(不含歧視性條款)的原則
招標的原則是公開、公平、公正,只有公平、公開才能吸引真正感興趣、有競爭力的投標廠商競爭,通過競爭達到采購目的,才能真正維護使用單位利益、維護國家利益。作為招標機構編制、審定標書,審定標書中是否含歧視性條款是最重要的工作。
4、維護企業利益、政府利益的原則
招標書編制要注意維護使用單位的商業秘密,如我們給聯想公司招八條電腦生產線(為了保護聯想公司電腦製造技術秘密而變換圖紙),也不得損害國家利益和社會公眾利益,如噪音污染必須達標,為了維護國家安全給廣電部招寬頻網項目分包時就非常注意這個問題。
E. 投標文件範本實例
工程投標書是每一位投標人都需要製作的文件,只有將工程投標書編制完好了才能順利開展接下來的投標、評標、開標、中標等重要環節,也才有希望成為中標人。那麼,編制工程投標書的基礎是什麼呢?就是基於國家規定和招標人要求的工程投標書模板範本。來一起看下采購文件網小編今天給大家分享的工程投標書製作範本吧!
工程投標書(範本)
標 書 總 目 錄
第一部分:投標書
一、投標書…………………………………………
二、投標申請單位概況……………………………
三、授權書…………………………………………
四、投標報價………………………………………
五、報價說明與建議………………………………
六、優惠條件………………………………………
第二部分:綜合說明
一、承建該工程的指導思想及目標………………
二、承建該工程的有利條件及優勢………………
三、工程工期目標及保證措施……………………
四、工程質量目標及保證措施……………………
第三部分:施工組織設計
一、工程概況………………………………………
二、施工方案概述…………………………………
三、編制施工進度和勞力計劃……………………
四、保證工程工期的具體措施……………………
五、施工程序與質量控制要點……………………
六、保證工程質量的具體措施…………………
七、安全文明施工的規定和措施………………
八、附圖附表………………………………………
第四部分:標書附件
一、資質證明………………………………………
二、企業相關制度…………………………………
三、證書及工程圖片………………………………
房屋建築投標書
第一部分:投標書
一、投標書(招標人名稱):各位領導、各位專家、各位評委:首先,感謝貴單位對我公司的信任,使我公司有機會參與貴單位的投標,我們深感榮幸並表示真誠的謝意。我公司仔細研究了貴單位工程的招標文件及有關資料,同時對施工現場及周圍環境進行了調查了解,經過反復論證、認真分析,願意承擔貴單位所發文件中的各項條款,同時做出了符合該工程工期、質量等各方面的施工安排,組織技術熟練、質量過硬、善打硬仗的施工隊伍負責該工程的施工。如蒙信任,由我公司中標承擔該工程的施工,我們兌現標書中的所有承諾,為貴單位做出我們應有的貢獻。投標單位:法定代表人:
單位地址:
郵政編碼:
聯系電話:
傳 真:
三、授權書
本授權書宣告:在下面簽字的 同志為我公司的名義合法代理人,就 工程以我公司的名義簽署投標書,進行投標、談判、簽署合同和處理與此有關的一切事務。
授權人:
被授權人:
投標單位:
投標日期:
四、投標報價(略)
五、報價說明與建議
1、我公司首先考慮用戶的不同需求,確定為三種配置價格供用戶自由選擇。
2、改變同類企業從五金配置上做文章的做法,公開透明買賣公道,以保護用戶的切身利益。
3、針對該工程的建築規模、建築標准、建築風格、地理環境、使用功能及消費群體。我們建議您:「什麼地方可設計什麼樣的門窗」、「什麼地方可使用什麼配置的五金件」,我們力求使用戶在門窗上達到最佳設計和最佳配置。
六、我公司承建該工程的優惠條件(略)
第二部分:綜合說明
(招標人名稱):
各位領導、各位專家、各位評委:我公司如若中標,我們將以良好的社會信譽、雄厚的技術實力、優質、熱情的服務,感謝貴單位對我公司的信任。我們將把該工程列為公司重點工程,從各個方面做好充分准備,及時組織產品生產、及時組織安裝人員進場,按期開工,優質高效地完成施工任務,兌現我們的所有承諾。現將標書重點內容綜述如下:
一、我公司承建該工程的指導思想及目標
1、指導思想:
我公司秉承集團「以質量求規模、以規模求效益」、「讓利不讓市場」的經營方針,為最大限度地發揮我公司設備先進技術力量雄厚、管理手段現代化的優勢,在獲取經濟效益的同時,力求獲取更大程度上的社會效益。我公司承建該工程決心是堅決的,我們的態度是:以積極誠實的態度、優質的服務,為業主建成一個高速、優質的工程項目。
2、工程目標:
(1)工程質量:合格率100%,定項優良率100%。
(2)工程進度:確保門窗分項,積極配合和促進總項計劃的實現。
二、我公司承建該工程的有利條件和優勢
1、具有承接該工程的綜合實力
具體詳情(略)。
2、具有先進的管理手段和管理班子
具體詳情(略)。
3、具有配套專業隊伍和成熟施工經驗
具體詳情(略)。
三、工程工期目標及保證措施
根據招標單位要求及工程實際情況,我們本著為業主服務,盡最大努力滿足業主要求的態度,參照國家定額工期,結合我公司的實際施工能力,確定該工程的施工總工期為____天,即從年月日開工,年月日竣工。為確保總工期的實現,我們擬採取以下保證措施:
1、組織措施
(1)該工程由我公司承建後,將列為我公司重點工程管理項目推行項目法施工,並充分發揮我公司技術力量強、資金雄厚、管理水平高的優勢,全力以赴協調解決施工力量和機具設備。
(2)實行公司重點項目指揮部領導下的項目經理負責制。由項目經理簽訂責任狀,對項目按工期進行監督、檢查,並與施工人員簽訂單位工程施工合同,及時兌現獎罰,實行單位工程包干施工,保證在控制點的時間內完成。
2、管理措施
(1)加快施工准備。我公司已經做好了承建該工程的各項准備工作,並按工程的需要保證在貴方要求的時間內,主要管理人員及時到位,同時編制切實可行的工程總進度網路計劃,並做好相應的日、旬、月計劃,堅持日平衡、旬調度,狠抓工程進度,保證計劃實施。
(2)根據確定的工期目標,編制切實可行的日、周、月、季、年計劃,運用網路技術、分段流水作業等動態管理和微機優選技術,充分利用作業面,切實做好工序之間的穿插施工,做到工期進度控制點保證總工期。
(3)充分協調好關系層與勞務層之間的關系,制定嚴密的獎罰措施,充分調動各方面的積極性,最大限度地提高勞動生產率。
(4)合理安排農忙季節和季節性施工。採取必要的措施,保證工程連續施工。加強與氣象部門的聯系,根據氣候情況,編制切實可行的季節性施工措施,最大限度地減少因氣候因素造成的停工。農忙季節決不放假,同時實行優惠的勞務經濟政策,調劑穩定勞動力,保證按工程進度計劃完成。
(5)運用新工藝、新技術、新材料、提高工程質量,加快施工進度,同時加強施工機具的管理,保證機具運轉良好,充分發揮其效能,確保施工正常進行。
(6)充分協調好外部關系,特別是搞好同建設單位、監理單位的關系,在工作中共同協作,互相支持。
四、工程質量目標及保證措施(略)
五、我公司產品和安裝質量執行的國家標准(略)六、服務回訪與公司保修政策(略)七、駐工地代表及主要負責人簡介八、部分優良工程及在建工程情況一覽表
第三部分:施工組織設計一、工程概況1、工程名稱:
2、施工地點:
3、建築面積:
4、塑鋼面積:
5、牆體結構:
6、類型:
7、高度:
8、層數:
二、施工方案概述工程質量為:保證優良、爭創「十佳」。工程工期:開工時間 年 月 日,竣工時間 年 月 日,總日歷天數 天。我公司將把該工程列為重點工程,公司將選派精乾的管理班子,成立該工程項目部。選派素質好、創優能力強的施工人員,裝備優良施工機具,以確保該工程質量和工期。
三、編制施工進度和勞力計劃
1、施工進度計劃編制依據:
(1)開工日期、完工日期、總工期天數。
(2)單窗、陽台窗、異型窗、門連窗、推拉門數。
(3)土建主體驗收時間、框安裝至完工時間、內外粉飾時間、扇安裝至完工時間。
2、勞力計劃編制依據:
(1)根據計劃工程量(m2)和計劃工期(天)要求,計算該工程總體需要多少個工人,才能按量按期完成。
(2)框安裝至完工,計劃需多少勞力、扇安裝至完工,包括細部處理打膠等,計劃需多少勞力。
四、保證工程工期的具體措施(略)
五、施工程序與質量控制要點(略)
六、保證工程質量的具體措施(略)
七、安全文明施工的規定和措施(略)
八、附圖附表
1、工程管理組織系統圖(略)。
2、施工進度計劃網路圖(略)。
3、工程質量管理體系圖(略)。
4、施工程序與質量控制要點一覽表(略)。
5、安全文明施工體系圖(略)。
第四部分:標書附件
一、資質證明
1、營業執照(副本)注冊號:××××××××××
2、稅務登記證:××××××××××
3、全國工業產品生產許可證:××××××××××
4、產品准用證:編號02340
5、×××市建設工程材料准用證××××××××××
6、質量體系認證證書:注冊號××××××
7、×××省名牌證書
8、檢驗報告:檢(建機)字(99)第C021
二、企業相關制度
1、公司質量手冊(略)。
2、公司保修服務承諾制度(略)。
三、證書及工程圖片(略)
以上就是工程投標書範本。一份完整的工程投標書通常包括投標書、綜合說明、施工組織設計、標書附件這四大部分,投標書中的內容是最重要的,也是我們最應該嚴格編制檢查的內容,這代表了我們作為投標單位承接項目的能力及誠意。
F. 主要為門禁、家居報警、可視對講,監控,弱電箱,道閘和室外管網這些方面的投標書範本,謝謝。
[ 門禁考勤系統 ]工程合同
1
合同目錄
一、合同總金額 ······································································ 3 二、產品名稱、型號、數量、價格、金額 ······························ 3 三、產品技術和質量標准 ······················································· 4 四、安裝完成日期 ·································································· 4 五、到貨地點 ········································································· 4 六、運輸和保險 ······································································ 4 七、驗收方式和要求······························································· 4 八、試運行 ············································································· 4 九、安裝 ················································································ 4 十、保質期 ············································································· 4 十一、維修 ············································································· 4 十二、支付方式 ······································································ 4 十三、違約責任 ······································································ 5 十四、不可抗力 ······································································ 5 十五、爭議的解決 ·································································· 5 十六、安全責任 ······································································ 5 十七、合同生效及其他 ··························································· 5
設備采購安裝合同
合同編號: 合同編號: 工程編號: 工程編號:
甲方:
地址: 地址: 電話: 電話: 乙方: 地址: 地址: 電話: 電話:
合
同總金額: 。 一、 合同總金額:人民幣[貳萬壹仟伍佰圓]整(含開票)
金額包括設備和軟體及技術資料到目的地的包裝費、至設備各現場的運輸費、裝卸費、 保險費、安裝費及安裝調試完成後 12 個月保修期所需的一切費用。
產品名稱、型號、數量、價格、金額: 二、 產品名稱、型號、數量、價格、金額:
名稱 JSFJSF-500 發卡機 JS168(EM) JS168(EM)一體機 JS485 通訊轉換器 門禁管理軟體 門禁管理軟體 Ver8.0 電磁鎖 開門按鈕 穩壓電源 網線 工程安裝費 台式電腦(清華同方) 台式電腦(清華同方) 數量 1 7 1 1 7 7 7 1 1項 1 3600 單價(元) 單價( 800 800 150 800 850 25 150 450 小計(元) 小計( 800 5600 5600 150 800 5950 5950 175 1050 450 2925 3600 ¥21.500.00 21.500.00 總價(含開票) 總價( 含開票) 雙聯 備注
註:EM 卡與門禁系統安裝完畢後同步到位,500 張價格為每張 8 元(含單面制卡費用) 。
技術和質量標准: 三、 技術和質量標准:乙方提供的設備須應符合 ITU-T、國家信息產業部、中 技術標准和技術規范。 安裝完畢時間: 四、 安裝完畢時間:合同簽訂後三周內完成。 到貨地點: 五、 到貨地點:甲方指定的地點。 。 運輸和保險: 乙方負責貨物運抵買方指定的地點並承擔運保費及所發生的 六、 運輸和保險: 一切費用。
七、 驗收方式和要求:安裝後一周進行現場初驗收。 驗收方式和要求:
八、 試運行: 試運行:安裝到位後進行初驗,初驗合格後進入三個月的試運行期。試運行期 結束後進行終驗,終驗合格後,雙方簽署終驗合格證書。
安裝: 本合同設備由乙方負責安裝, 安裝所需費用已包含在合同總金額中。 九、 安裝: 保修期: 十、 保修期:詳見售後服務承諾。 十一、 維修:保修期為一年,保修期內供貨商保證在設備發生故障後 24 小時 十一、 維修: 內予以更換或修復。 十二、 支付方式: 十二、 支付方式:
12.1 安裝完畢初驗合格後付 40%,終驗合格後付 50%,工程總價的 10%作為質量保證金。 保修期後若無質量問題,則返回 10%質保金。 貨款電匯至: 開戶銀行:工商銀行杭州錢江支行高教園區分理處 開戶銀行:
賬號: 賬號:1202023419100004705 戶名: 戶名:浙江浙大中控信息技術有限公司 十三、違約責任: 十三、 違約責任:
13.1 除不可抗力原因外,如果因乙方原因造成安裝延誤, (交貨期從買方發給賣方需求通知 日計算) ,乙方須支付違約金,該違約金在本合同的有關付款項中扣除。違約金每天為 合同總額的 0.5%, 本條款累計違約金不應超過合同總額的 10%, 對違約金的支付並不 排除賣方履行合同的責任。 13.2 合同簽訂後第2/3頁
若安裝完成延遲時間超過 2 周,則甲方有權終止本合同及供貨協議,改訂 其它公司的同類產品,由此,而使甲方或最終用戶增加的額外的費用應由賣方承擔, 並應向甲方支付合同總價 10%的違約金,同時承擔甲方由此產生的全部經濟損失。 13.3 如果設備質量達不到技術規范要求, 乙方在用戶使用 2 個月後仍不能解決問題, 則乙方 的質量保證金不予退還。在此情況下,甲方有權解除合同和供貨協議。解除合同後, 乙方應退還甲方已支付的款項並賠償相關損失。 13.4 上述違約金總額不超過合同總額的 20%。
十四、不可抗力: 十四、不可抗力:
由於一般公認的人力不可抗拒的原因及其他由雙方確認的不可抗力而致交貨遲延, 賣方 不承擔責任。但賣方必須在事故發生時立即傳真告知買方,並在事故發生後 15 天內寄給甲 方災害發生的地點之有關政府機關或商會所發給的證件證實災害的存在。
十五、爭議的解決: 十五、爭議的解決:
雙方必須依據《中華人民共和國合同法》及其他有關法律和規定嚴格執行本合同。在執 行合同中,雙方如就本合同的效力,解釋或者履行發生爭議,應首先通過友好協商解決。協 商解決不成,任何一方均有權向乙方住所地有管轄權的人民法院提起訴訟。
十六、安全責任: 十六、安全責任: 責任
16.1 當根據合同第八條要求,設備由乙方負責安裝時,乙方須按有關規定,採取嚴格的安 全防護措施,承擔由於自身安全措施不當造成事故的責任和因此發生的費用。發生重 大傷亡事故,乙方應按有關規定立即上報有關部門通知甲方。 16.2 由於乙方設備工藝質量、安裝工藝質量、技術資料不齊備、技術支持不力等原因,造 成買方網路安全事故的,乙方應承擔由此產生的損失和費用。
十七、合同生效及其他: 十七、合同生效及其他:
17.1 合同由雙方單位蓋章並授權代表簽字後生效。 17.2 在執行本合同期內,各方的所有通知應採用書面的方式進行,如合同需更改,經雙方 友好協商後,須以書面形式由雙方授權代表簽字後生效。 17.3 本合同一式肆份,雙方各執貳份,具有同等法律效力。
甲方: 甲方: 授權代表: 日期:
乙方: 乙方: 授權代表: 日期:
G. 標書的格式是什麼樣子啊
說明本投標文件為範本,投標單位投標時應根據自己的實際情況及招標文件,投標申請人資格預審須知等文件編制投標文件,投標文件由投標函部分,商務部分和技術部分三部分組成. 工程施工招標投標文件 項目編號: 項目名稱: 投標文件內容: 投標文件投標函部分 投標人: (蓋章) 法定代表人或其委託代理人: (簽字或蓋章) 日期: 目錄法定代表人身份證明書投標文件簽署授權委託書投標函投標函附錄投標擔 銀行保函格式投標擔保書投標文件要求投標人提交的其他投標資料 單位名稱: 單位性質: 成立時間: 經營期限: 姓名: 性別: 年齡: 職務:系( 投標人單位名稱) 的法定代表人.特此證明.房屋建築和市政基礎設施工程施工投標文件範本 二、投標文件簽署授權委託書 本委託書聲明:我(姓名)系(授權人名稱)的法定代表人、現授權委託(本單位名稱)的(姓名) 為我公司簽署本工程的投標文件的法定代表人授權委託代理人、我承認代理人全權代表我所簽署的本工程的投標文件的內容. 代理人無轉委託權、特此委託. 代理人:(簽字) 性別: 年齡: 身份證號碼: 職務: 法定代表人: (簽字或蓋章) 委託授權日期: 致:(招標人名稱) 1,根據你方招標項目編號為的工程招標文件,遵照等有關規定,經踏勘項目現場和研究上述招標文件的投標須知,合同條款,圖紙、工程建設標准和工程量清單及其他有關文件後,我方願以(幣種、金額、單位) (小寫) 的投標報價並按上述圖紙、合同條款,工程建設標准和工程量清單的條件要求承包上述工程的施工,竣工,並承擔任何質量缺陷保修責任. 2,我方已詳細審核全部招標文件,包括修改文件(如有時)及有關附件. 3,我方承認投標函附錄是我方投標函的組成部分. 4,一旦我方中標,我方保證按照合同協議中規定的工期日歷天內完成並移交全部工程. 5,如果我方中標,我方將按照規定提交上述總價%的銀行保函或上述總價%的由具有擔保資格和能力的擔保機構出具的履行擔保書作為履約擔保. 6,我方同意所提交的投標文件在投標申請人須知第15條規定的投標有效期內有效,在此期間內如果中標,我方將受此約束. 7,除非另外達成協議並生效,你方的中標通知書和本投標文件將成為約束雙方的合同文件的組成部分. 8,我方將與本投標函一起,提交(幣種、金額、單位) 作為投標擔保. 法定代表人或代理人: (簽字或蓋章) 開戶銀行名稱: 開戶銀行帳號:日期 四、投標函附錄序號項目內容合同條款號約定內容備注履約保證金銀行保函履約擔保書金額合同價款的%施工准備時間簽定合同後的天誤期違約金額元天誤期賠償費限額提前工期獎施工總工期日歷天質量標准工程質量預付款金額預付款保函金額進度款付款時間簽發月付款憑證後天竣工結算款付款時間簽發竣工結算付款憑證後天保修期依據保修書約定的期限 四、 投標文件 五、投標擔保銀行保函格式(具體格式由擔保銀行提供) 六、投標擔保書 致: (投標人名稱) 根據本擔保書, (投標人名稱)作為委託人(以下簡稱投標人)和(投標擔保機構)作為擔保人(以下簡稱擔保人)共同向(招標人名稱) (以下簡稱招標人)承擔支付(幣種、金額、單位) (小寫) 的責任,投標人和擔保人均受本擔保書的約束. 鑒於投標人於參加招標人的(招標工程項目) 的投標,本擔保人願為投標人提供投標擔保. 本擔保的條件是:如果投標人在投標有效期內收到你方的中標通知書後:不能或拒絕按投標須知的要求簽署合同協議書;不能或拒絕按投標須知的規定提交履約保證金;在投標有效期內撤回投標文件.只要你方指明產生上述任何一種情況的條件時,則本擔保人在接到你方以書面形式的要求後,即向你方支付上述全部款額、無需你方提出充分證明其要求. 本擔保人不承擔下述金額的責任:大於本擔保書規定的金額;大於投標人投標價與招標人中標價之間的差額的金額.擔保人在此確認,本擔保書責任在投標有效期或延長的投標有效期滿後28天內有效,若延長投標有效期無需通知本擔保人、但任何索款要求應在上述投標有效期內送達本人. 擔保人: (蓋章) 法定代表人或委託代理人: (簽字或蓋章) 郵政編碼: 七、投標保證金:(建設單位名稱)我單位接受貴單位的邀請,參加工程投標,根據招標文件的要求,我單位現遞交投標保證金元(大寫: 整) 本保證義務的條件是:如果投標人在投標書中規定的投標書有效期內撤回標書;如果投標人在投標書有效期內接建設單位所發的中標通知書後;未能或拒絕根據投標須知的規定,按要求簽署合同協議書;未能或拒絕按投標須知的規定,提供履約保證金.違反相關招標法規有關廢標的規定.招標人有權沒收投標人的保證金.當投標人落標時,可退還招標文件及所附圖紙等資料,同時招標人向其退還投標押金.(無息)投標單位(公章)投標單位法人代表(簽字,蓋章) 八、招標文件要求投標人提交的其他投標資料(本項無格式,需要時由招標人用文字形式提出)投標文件商務部分格式 投標文件內容: 投標文件商務標部分目錄(採用綜合單價形式的) (本部分以招標文件要求及工程量清軟體的表格為准)投標報價說明 二、投標報價匯總表 三、主要材料清單報價表 四、設備清單報價表 五、工程量清單報價表 六、措施項目報價表 七、其他項目報價表 八、工程量清單項目價格計算表 九、投標報價需要的其他資料本報價依據本工程投標須知和合同文本的有關條款進行編制.工程量清單標價表中所填入的綜合單價和合均價包括人工費、材料費、機械費、管理費、利潤,稅金以及採用固定價格的工程所測算的風險金等全部費用. 措施項目標價表中所填入的措施項目報價.包括為完成本工程項目施工必須採取的措施所發生的費用. 其他項目標價表中所填入的其他項目標價,包括工程量清單報價表和措施項目報價表以外的,為完成本工程項目施工必須發生的其他費用. 本工程量清單報價表的每一單項均應填寫單價和合價,對沒有填寫單價和合價的項目費用,視為已包括在工程量清單的其他單價和合價之中. 本報價的幣種為投標人應將投標報價需要說明的事項、用文字書寫與投標報價表一並報送. 投標文件技術部分格式 招標文件內容: 投標文件技術部分 投標人:(蓋章) 法定代表人或其委託代理人:(簽字或蓋章)施工組織設計項目管理機構配備情況擬分包項目情況表 1,投標人應編制施工組織設計,包括招標文件第一卷第一章投標須知11.4項規定的施工組織設計基本內容.編制的具體要求是:編制時應採用文字並結合圖表形式說明各分部分項工程的施工方法;擬投入的主要施工機械設備情況,勞動力計劃等;結合招標工程特點提出切實可行的工程質量,安全生產,文明施工,工程進度,技術組織措施,同時應對關鍵工序,復雜環節重點提出相應技術措施,如冬雨季施工技術措施,減少擾民噪音,降低環境污染技術措施,地下管線及其他地上地下設施的保護加固措施等.工組織設計除採用文字表述外應附下列圖表,圖表及格式要求附後. 2,施工組織設計除採用文字表述外應附下列圖表,圖表及格式要求附後. 2.1擬投入的主要施工機械設備表表1.1 2.2勞動力計劃表表1.2 2.3計劃開、竣工日期和施工進度網路圖表1.3 2.4施工總平面圖表1.4 2.5臨時用地表表1.5 擬投入的主要施工機械設備表(工程項目名稱) 工程表1.1序號機械或設備名稱型號規格數量國別產地製造年份額定功率(KW)生產能力用於施工部位勞動力計劃表(工程項目名稱) 工程表1.2工種按工程施工階段投入勞動力情況 注:1.投標人應按所列格式提交包括分包人在內的估計勞動力計劃表. 2.本計劃表是以每班八小時工作制為基礎編制的. 計劃開、竣工日期和施工進度網路表1.3 1,投標人應提交的施工進度網路或施工進度表,說明按招標文件要求的工期進行施工的各個關鍵日期.中標的投標人還應按合同條件有關條款的要求提交詳細的施工進度計劃. 2,施工進度表可採用網路圖(或橫道圖)表示、說明計劃開工日期和各分項工程各階段的完工日期以及分包合同簽訂的日期. 3,施工進度計劃應與施工組織設計相適應. 施工總平面圖表1.4投標人應交一份施工總平面圖,繪出現場臨時設施布置圖表並附文字說明,說明臨時設施,加工車間,現場辦公,設備及倉儲,供電,供水,衛生,生活等設施的情況和布置. 臨時用地表(工程項目名稱) 工程表1.5用途面積(m )位置需用時間合計 注:1.投標人應逐項填寫本表,指出全部臨時設施用地面積以及詳細用途. 2.若本表不夠,可加附頁. 項目管理機構配備情況表表1.6項目經理簡歷表表1.7項目技術負責人簡歷表表1.8項目管理機構配備情況輔助說明資料表1.9項目管理機構配備情況表表1.6(工程項目名稱) 工程職務姓名稱執業或職業資格證明已承擔在建工程情況證書名稱級別證號專業原服務單位項目數主要項目名稱一旦我單位中標,將實行項目經理負責制,並配備上述項目管理機構.我方保證上述填報內容真實,若不真實,願按有關規定接受處理.項目管理班子機構設置,職責分工等情況另附資料說明項目經理簡歷表(工程項目名稱)工程表表1.7姓名性別年齡職務職稱學歷參加工作時間擔任項目經理年限項目經理資格證書編號在建和已完工程項目情況建設單位項目名稱建設規模開、竣工日期在建或已完(3)項目技術負責人簡歷表(工程項目名稱)工程表1.8擔任技術負責人年限(4)項目管理機構配備情況輔助說明資料(工程項目名稱) 工程表1.9 注:1.輔助說明資料主要包括管理機構的機構設置,職責分工,有關復印證明資料以及投標人認為有必要提供的資料.輔助說明資料格式不做統一規定,由投標人自行設計. 2.項目管理班子配備情況輔助說明資料另附(與本投標文件一起裝訂). (工程項目名稱) 工程表1.10分包人名稱地址法定代表人營業執照號碼資質等級證書號碼擬分包的工程項目主要內容預計造價(萬元)已經做過的類似工程
H. 求網路工程存儲系統投標書
網路工程系統整體設計投標書-供網路工程的考生參考學習。
這是一份BENET上海分公司網路工程系統設計投標書,設計方是
萬維網路科技有限公司。通過這個方案,給大家一個大致的印象,以幫助考生對網路工程的需求、規則、設計、組建、售後等有所了解。
最終目的: 採用先進的計算機、網路設備和軟體,以及先進的系統集成技術和管理模式,為用戶提供一個既能滿足現有需求又具有擴展升級能力、同時達到最高性價比的辦公網路體系。
-------------------------------------------------
網路工程整體設計方案
採用先進的計算機、網路設備和軟體,以及先進的系統集成技術和管理模式,為用戶提供一個既能滿足現有需求又具有擴展升級能力、同時達到最高性價比的辦公網路體系。
一、用戶需求分析
二、綜合布線系統設計
三、網路系統設計
四、設備選型
五、系統設計
六、安全設計
一、用戶需求分析
1、公司管理模式
◆公司各部門經理向總經理負責
◆各部門員工向部門經理負責
2、公司下設機構
◆財務部、人事總務部、市場銷售部、技術開發部
3、用戶系統需求
◆用戶安全、帳戶管理
◆用戶許可權管理
◆網路訪問控制
◆事件日誌
4、建設原則
◆開放性、靈活性、可靠性、安全性、可擴展性、可管理性
二、布線系統設計
依照「統一568商業大廈布線標准」採用模塊化設計和星型拓撲結構,實施超五類網路布線 。
二、布線系統設計
1、工作區子系統
工作區子系統由終端設備連接到信息面板的跳線和信息面板所組成,通過面板即可以連接計算機。水平系統的雙絞線一端在這里端接。插頭選用8芯RJ45型。跳線用於連接插座與計算機。跳線的兩端帶RJ45插頭。
二、布線系統設計
2、水平子系統
水平子系統的作用是將主幹子系統的線路延伸到用戶工作區子系統。本方案採用全5類線模式。水平子系統將採用超5類屏蔽雙絞線連接到工作區信息模塊。超5類屏蔽雙絞線是目前性能價格比最好的高品質傳輸介質,其性能指標完全符合EIA/TIA-568標准。
二、布線系統設計
3、設備間子系統(主機房)
設備間子系統是綜合布線系統中為各類信息設備(如路由器、交換機、文件伺服器等設備)提供信息管理,信息傳輸服務。設備間子系統是綜合布線的關鍵,它是管理子系統的安裝場所,因此我們採用標準的電信機櫃,將路由器和交換機集成到櫃中,便於統一管理。水平子系統的雙絞線另一端在這里連接。
二、布線系統設計
4、測試
我方將負責布線系統的測試。工程人員將採用CSICO公司提供的測試設備,對系統進行完整的測試,並詳細填寫記錄,其中包括線序、通路、短路、串擾及衰減的測試,以確保滿足布線國際標准。在工程完工後,我方將向用戶提供整套布線系統的完整資料文檔。
三、網路系統設計
◆ 網路拓樸圖
三、網路系統設計
◆ IP地址劃分
路由器外埠及大廈介面IP: 202.100.2.254----202.100.253/30
路由器內埠(網關)IP:192.168.1.11/24
交換機管理IP:192.168.1.12----192.168.1.13/24
伺服器:192.168.1. 1----192.168.1.4/24
客戶端:192.168.2.0-3.0-4.0/24
其他剩餘地址留做公司以後擴展使用
四、設備選型
◆ 交換機:CISCO WS-C2950T-48-ST
◆ 路由器:CISCO 2611XM
◆ 伺服器:聯想萬全T168 G3 S3040
◆ 客戶機:聯想揚天M2600C
◆ UPS電源:山特 C3KS
◆ 列印機: HP Color LaserJet 3600(Q5986A)
HP laserjet 1022N
五、系統設計
1、域控制器設計
2、文件伺服器設計
3、代理伺服器設計
4、列印伺服器設計
5、存儲備份設計
6、客戶端設置
五、系統設計
1、域控制器設計
◆ 域規劃圖
五、系統設計
1、域控制器設計
◆ 用戶組織結構圖
五、系統設計
2、文件伺服器設計
◆ 硬碟分區
◆ 啟用磁碟配額
◆ 採用NTFS文件系統
五、系統設計
3、代理伺服器設計
五、系統設計
4、列印伺服器設計
5、存儲備份設計
6、客戶端設置
六、安全設計
系統安全
物理安全
網路安全
伺服器端
客戶端
七、售後服務
工程進度分成以下幾個階段(時間以合同簽定後起算):
1.軟、硬體設備訂購(第一周);
2.軟體方案設計(第一周至第二周);
3.工程實施方案制定(第一周至第二周);
4.設備到貨驗收(第三周);
5.工程人員及設備進場(第三周);
6.設備安裝調試(第三周至第四周);
7.初驗(第五周);
8.試運行(第五周至第六周);
9.終驗(試運行三個月)。
八、技術支持與培訓
我方應向購BENET公司方提供足夠的技術支持和培訓課程,保證系統運行後的正常運轉。提供24小時的熱線支持,保障系統正常運行,在系統發生重大故障時,我方技術人員應在24小時內到達事故現場。
九、保修期
從最終驗收完成之後的一年為保修期,保修期間我方要保修除消耗品以外的所有設備。在保修期內,如果系統發生故障,設備的所有硬體和軟體出現的不合格部分,我方要調查故障原因並迅速修復或更換,直至滿足最終驗收指標和性能的要求,或者更換整個或部分有缺陷的材料。由此所發生的全部費用由我方負責。
保修期以後,我方對其提供的設備提供終身的技術支援。對於設備故障,我方應在24小時內作出響應並及時修復。
I. 請幫忙提供一個技術招標書的範本
文件太大,沒有辦法全部貼上來,先看看目錄吧
目 錄
1. 投標要求 1
2. 范圍 2
2.1. 概述 2
2.2. 賣方職責 4
2.3. 買方職責 5
3. 規范標准 7
3.1. 概述 7
3.2. 適用標准 7
4. 總體要求和系統性能 8
4.1. 系統總體要求 8
4.1.1. 系統結構和范圍 8
4.1.2. 網路結構 9
4.1.3. 系統冗餘要求 9
4.1.4. 系統及數據備份 9
4.1.5. 擴容和升級要求 10
4.1.6. 可靠性 10
4.1.7. 維護的方便性 11
4.1.8. 故障切換和重啟動 11
4.1.9. 自動監視告警系統 11
4.1.10. 系統安全性 11
4.1.11. 系統應用功能要求 12
4.2. 主站系統技術指標 12
4.2.1. 運行壽命 12
4.2.2. 系統可靠性指標 12
4.2.3. 指標 13
4.2.4. CPU及網路負荷率 13
4.2.5. 漢字顯示 13
5. 系統硬體配置及要求 13
5.1. 電量計量伺服器 14
5.1.1. 功能及構成 14
5.1.2. 配置及技術性能 15
5.2. 計量工作站 15
5.2.1. 功能與構成 15
5.2.2. 配置及技術性能 16
5.3. 電量計量終端伺服器 16
5.4. 數據機 16
5.5. 磁碟陣列櫃 17
5.6. 外設 17
5.6.1. 外設 17
5.7. 區域網設備 17
5.8. 配套設備 18
6. 廠站部分(本招標不含此項內容) 18
6.1. 電能表技術要求 18
6.2. 電量數據處理採集裝置技術要求 19
7. 系統軟體和支撐軟體 21
7.1. 基本要求 21
7.2. 系統軟體 22
7.2.1. 操作系統(OS) 23
7.2.2. 應用開發工具 24
8. 系統安全 25
8.1. 網路安全 25
8.2. 系統備份 25
8.3. 數據備份 26
9. 電氣和環境條件要求 26
9.1. 機房環境 26
9.2. 機房供電 27
9.3. 機房接地 27
10. 設計聯絡 27
11. 技術培訓 29
12. 系統驗收測試 30
12.1. 概述 30
12.2. 工廠驗收(FAT) 32
12.3. 現場驗收(SAT) 34
13. 包裝、運輸、安裝和現場服務 35
13.1. 包裝和運輸 35
13.2. 安裝和現場服務 36
14. 備品備件、維修工具 36
15. 質量保證要求與售後服務 37
16. 工程進度 37
17. 技術資料和文件 38
17.1. 概述 38
17.2. 數量 39
17.3. 資料內容和進度要求 39
17.4. 圖紙規格和質量 42
17.5. 用戶手冊及技術文件 42
附圖1 44
1. 投標要求
賣方必須提供兩套採用不同計算機生產廠家設備構成的系統硬體配置方案,並進行兩套方案技術經濟性能比較,給出推薦方案。本標書給出了一套建議方案,見附表1。
a) 賣方提供的系統硬體應滿足電力市場技術支持系統電量計量子系統及相關系統軟體運行的相關要求。
b) 賣方必須按本技術規范書要求,提供買方一個整體方案硬體應標。買方與軟體中標商共同以議標方式確定硬體中標商。
c) 賣方應該提供滿足本規范書中要求的完整的系統和服務支持。
d) 賣方必須按本規范書的順序對各章的每一項給予回答。建議書必須清楚地指明所響應規范書中各章每一項要求的實際指標值,以說明是否滿足其要求。如果不滿足規范書要求,以「性能差異表」的形式單獨列出。如果賣方認為標書所描述功能、介面、設備等與目標系統要求有所不一致或部分要求不合理,可在響應原要求後給出建議方案及設備配置,此建議在評標時將作為重要內容加以考慮,並有責任提高系統的功能達到實用化要求的標准。
e) 賣方必須滿足主要項目的要求,否則其建議書將被拒絕並被認作沒有回答。
f) 賣方必須提供一個准確的陳述。對每個單項產品,賣方必須提供原廠商的正式技術指標說明材料。
g) 賣方在投標建議書中建議的每個硬體和軟體的型號/部件號必須逐一說明。賣方認為需特殊說明的部分應附詳細的技術資料,否則,由於評標理解不同,產生的後果由賣方負責。
h) 賣方建議書的內容應該包括買方要求的全部設備及其相關的連接設備、電纜等,需要報價的也在清單中給出,以保證所購設備得以正常連接和運行。否則,相關連接設備的費用被視為已包含在報價中。
i) 賣方建議書要以中文書寫,提供投標的所有技術指標說明材料及相應資料以中文(或英文)書寫。
j) 賣方建議書的詳細要求見招標書的商務部分。賣方必須隨建議書提供具有全部建議內容的3.5寸軟盤文件兩份。磁碟文件格式要求為:文字部分用WORD 2000,表格部分用EXCEL 2000。投標內容以印刷的建議書正本為准。
k) 賣方應保證對本次招標所有技術說明文件保密,在招標前和招標後不得向其他單位公布招標項目單位的有關材料,否則承擔一切後果。
l) 賣方必須提供符合本技術規范書要求的設備,所有設備必須為新設備,並能在中國境內安全使用。
m) 賣方必須提供滿足本技術規范書要求的軟體系統,所有軟體必須是正版且具有使用許可證的產品,具有在中國境內的合法使用權。
應答:理解並滿足要求。